Detailed Installation Steps
Step 1: Make the foundation
Model 1 Model 2
Step 2: Measure the size and set the line
Step 3: Carry the panel in position
Step 4: Cut the panel in need
Step 5: Erect the panel
Step 6: Upright the panel
Step 7: Adjust the panel
Step 8: Join the panel with PU Foam
Step 9: Knock the steel bar (30cm length) into the top of two panels by 45 degree.
Step 10: Leave a door hole
Step 11: Leave a window hole
Step 12: The gable
Step 13: The horizontal press panel
Step 14: The wall finished
Model 1 A wall finished
Model 1 Half finished
Model 1 All the wall finished
Model 2 A wall finished
Model 2 Half finished
Model 2 All the wall finished
Step 15: Stick the anti-crack tape with putty powder
Step 16: Install the roof
Model 1 Installed with roof iron
Model 2 Installed with DAQUAN PANEL
Step 17: Install the electrical wires and switches
Step 18: Install the door frame and door
Step 19: Install the window
Step 20: Decorate with cetamic tiles or painting, wall paper and so on.
Overview
Model 1
http://v.youku.com/v_show/id_XNjk0MjA4NDAw.html?from=s1.8-1-1.2
1
達權專業工程師現場指導安裝2
介紹推薦值得信奈的專業施工隊伍3
包工包料負責所有施工